Sr.No. |
Client |
Scope of Work |
Job awarded |
1. |
Institute of Fire, Safety & Disaster Management Studies |
Consultancy for obtaining NOC
(consent to establish) & CCA
|
July
2011
|
2. |
Suguna Poultry Farm Ltd., Anand |
Consultancy for CCA
| Dec.
2009
|
3. |
Valsad District Co-operative Milk Producers’ Union Ltd., Motaponda |
Consultancy for obtaining NOC
(consent to establish) & CCA
|
May
2009
|
4. |
Diamond & Gem Development Corporation Limited, Sachin, Surat |
Consultancy for obtaining NOC (consent to establish) & CCA |
April 2009 |
Sr.No. |
Client |
Scope of Work |
Job awarded |
1. |
Transpek Silox Industry Ltd, Ekalbara
|
Treatability Study for the Designing Effluent Treatment Plant
|
July
2010
|
2. |
BASF India Ltd., Unit-I & II, Ankleshwar |
Treatability Study for Up-gradation of Existing Effluent Treatment Plant
| July 2010 |
3. |
Gujarat Containers Limited |
Treatability Study for Up-gradation of Existing Effluent Treatment Plant
|
November
2009
|
4. |
Chitawon Milk Pvt. Ltd., Nepal |
Treatability Study for the Designing Effluent Treatment Plant
|
October
2007
|
5. |
Jayant Oils & Derivatives Ltd., Vadodara |
Treatability Study for the Designing Effluent Treatment Plant |
October 2006 |
Sr.No. |
Client |
Scope of Work |
Job awarded |
1. |
ABC Bearings Ltd., Bharuch
|
Operation & Maintenance of Sewage Treatment Plant
(Capacity: 30 m3/day)
|
June 2006
till date
|
2. |
Cadila Healthcare Ltd., Dabhasa |
Operation & Maintenance of Effluent Treatment Plant
(Capacity: 250 m3/day)
| October 2008 to
September 2010
|
3. |
Amiantit Fiberglass Industries India Pvt. Ltd., Savli
|
Operation & Maintenance of Sewage Treatment Plant
(Capacity: 20 m3/day)
|
August
2011
till date
|
4. |
Huntsman Performance Products India Pvt. Ltd., Panoli |
Operation & Maintenance of Effluent Treatment Plant
(Capacity: 300 m3/day)
|
August
2011
till date
|
5. |
Kaira Dist. Co-op. Milk Producers’ Union Ltd., Amul Dairy, Anand |
Operation & Maintenance of Effluent Treatment Plant at KSD Plant
(Capacity: 1500 m3/day)
|
October
2011
till date
|
Sr.No. |
Client |
Scope of Work |
Job awarded |
1. |
Cadila Healthcare Ltd., Dabhasa
|
Environment Monitoring Work
|
October 2008 to
September 2010
|
2. |
R. R. Kable, Waghodia Unit
|
Environment Monitoring Work
| August 2011 till date |
3. |
Schott Kaisha India Pvt. Ltd, Ankhi, Tal. Jambusar |
Environment Monitoring Work
|
October 2012
|